offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›Nautec on Grouting Duty at Chinese Offshore Wind Farm
Operations & Maintenance

May 30, 2019 · about 7 years ago

Nautec on Grouting Duty at Chinese Offshore Wind Farm

The Singapore-based Nautec is supporting the grouting work at the CTGNE Yangjiang Shapa Phase 1 offshore wind farm in China. The company said that its material specialists and grouting engineers are assisting with grouting for turbine and substation jacket foundations at the 300MW project. Nautec is

1 minutes read
  • LinkedIn
  • X
  • Email

The Singapore-based Nautec is supporting the grouting work at the CTGNE Yangjiang Shapa Phase 1 offshore wind farm in China.

The company said that its material specialists and grouting engineers are assisting with grouting for turbine and substation jacket foundations at the 300MW project.

Nautec is supplying its NaX grouting materials for a total of 10 turbine jackets and one substation jacket, with a local partner carrying out the grouting operation.

“Despite the hot weather condition nearing 35°C, grouting has progressed smoothly without any operational delays,” Nautec stated.

CTGNE Yangjiang Shapa Phase 1 represents the third offshore renewable energy project and the first major wind farm installation project that Nautec has worked on in Chinese waters.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Operations & Maintenance

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

13 days ago

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

15 days ago

Bernhard Schulte Offshore Takes Delivery of Fourth CSOV in Newbuild Series
Business & Finance

Bernhard Schulte Offshore Takes Delivery of Fourth CSOV in Newbuild Series

26 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

13 days ago
Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

15 days ago
Bernhard Schulte Offshore Takes Delivery of Fourth CSOV in Newbuild Series
Business & Finance

Bernhard Schulte Offshore Takes Delivery of Fourth CSOV in Newbuild Series

26 days ago