offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›News›ABPmer Preps Arklow Bank Preliminary Site Condition Report
News

June 21, 2019 · about 7 years ago

ABPmer Preps Arklow Bank Preliminary Site Condition Report

SSE Renewables has appointed ABPmer to deliver the preliminary site condition report for the Arklow Bank offshore wind project in Ireland. ABPmer will also manage the associated metocean survey which will be used in conjunction with new numerical modeling to refine the preliminary results and inform

1 minutes read
  • LinkedIn
  • X
  • Email

SSE Renewables has appointed ABPmer to deliver the preliminary site condition report for the Arklow Bank offshore wind project in Ireland.

ABPmer will also manage the associated metocean survey which will be used in conjunction with new numerical modeling to refine the preliminary results and inform a final site condition report.

According to SSE, the reports provide a range of metocean statistics, as well as a description of the seabed morphology, sediment transport patterns and a high-level assessment of scour potential.

This provides a basis for engineering design and operational planning, which will be further refined and validated from the early planning stages through to final design, the company said.

All the information is used to support the design, installation and decommissioning phases of the 520MW project.

“We regularly undertake metocean and morphological analysis for offshore wind farms but the mixture of relatively shallow water, stronger tidal currents and exposed wave climate make this a particularly interesting location to study,” said David Lambkin , ABPmer Project Manager.

“Our validated hindcast databases – SEASTATES – are the starting point for any metocean studies or parameters we provide and have been used to inform the preliminary report. As we move forward, this will be supplemented and validated with new data from a metocean survey and new high-resolution, site specific numerical modelling.”

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

News

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago

Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition
News

Seawork Awards 2026 Entries Rise by 43% at Southampton Flagship Exhibition

about 2 months ago
Lamprell Dong Fang Offshore vessel
News

Lamprell, Dong Fang Offshore Ink Wind Turbine Installation Vessel Deal

about 1 year ago