offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Vessels›RNLI Assists Injured Wind Farm Guard Vessel Crewman
Vessels

June 27, 2019 · about 7 years ago

RNLI Assists Injured Wind Farm Guard Vessel Crewman

The Barrow Lifeboat Station’s volunteer crew launched their all-weather lifeboat to go to the aid of an injured crewman aboard a wind farm guard vessel on 25 June, the Royal National Lifeboat Institution (RNLI) said. The request to launch came from the HM Coastguard base in Holyhead at 4-50pm local

1 minutes read
  • LinkedIn
  • X
  • Email

The Barrow Lifeboat Station’s volunteer crew launched their all-weather lifeboat to go to the aid of an injured crewman aboard a wind farm guard vessel on 25 June, the Royal National Lifeboat Institution (RNLI) said.

The request to launch came from the HM Coastguard base in Holyhead at 4-50pm local time. The Coastguard had received the request for assistance from the wind farm guard vessel, Fairline Surveyor, which was south of the West of Duddon Sands offshore wind farm. The vessel’s Master reported that one of the crewmen on board, reportedly a cook, had sustained a serious hand injury that required urgent treatment.

The Grace Dixon lifeboat proceeded at full speed to rendezvous with the Fairline Surveyor approximately six miles southwest of Walney Island. The injured crewman was transferred to the lifeboat where his condition was assessed by the lifeboat’s medical team during the passage back to Barrow.

The decision was made to take the casualty to the Deep Water Berth pontoon at Barrow Port where the Furness Coastguard team was waiting to transport him to Furness General Hospital.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Vessels

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

16 days ago

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

19 days ago

South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project
Contracts & Tenders

South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project

24 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

16 days ago
Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

19 days ago
South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project
Contracts & Tenders

South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project

24 days ago