offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Contracts & Tenders›Sif Receives Order for First Dutch Zero-Subsidy Offshore Wind Project
Contracts & Tenders

July 11, 2019 · about 7 years ago

Sif Receives Order for First Dutch Zero-Subsidy Offshore Wind Project

Sif Holding has secured a contract to manufacture 114 monopiles for three out of four zones of Vattenfall’s 1.4GW Hollandse Kust (Zuid) offshore wind project in the Netherlands. Under the contract, Sif will use 113KTon of steel for manufacturing the monopiles and will store them at the MV2 facility

1 minutes read
  • LinkedIn
  • X
  • Email

Sif Holding has secured a contract to manufacture 114 monopiles for three out of four zones of Vattenfall’s 1.4GW Hollandse Kust (Zuid) offshore wind project in the Netherlands.

Under the contract, Sif will use 113KTon of steel for manufacturing the monopiles and will store them at the MV2 facility in Rotterdam in 2020-2021.

“Our manufacturing facilities in Rotterdam are ideally situated for North Sea offshore wind projects. For the Hollandse Kust Zuid project Vattenfall/Nuon has valued this in their bid- evaluations,” said Fred van Beers , Sif CEO.

“We are grateful for the confidence our client has expressed in their project- award to Sif and together with their representatives we will put every effort on the timely delivery of time-critical project-parts. Our orderbook for the period 2020- 2021 is now filling up to approximately 300 Kton of which 80 Kton in exclusive negotiations.”

Vattenfall is the winner of both the Hollandse Kust (Zuid) I & II and Hollandse Kust (Zuid) III & IV offshore wind tenders, which mark the first Dutch zero-subsidy projects.

Each of the four zones is expected to have a 350MW capacity scheduled for grid connection in 2022.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Contracts & TendersWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

17 days ago

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

18 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

17 days ago
Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

18 days ago