offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Wind Farm Update›German Offshore Wind Farm Entering Turbine Installation Phase
Wind Farm Update

July 15, 2019 · about 7 years ago

German Offshore Wind Farm Entering Turbine Installation Phase

Jan De Nul’s offshore installation vessel Taillevent is en route to Eemshaven in the Netherlands to start loading the first turbine components for the Trianel Windpark Borkum II (TWBII) offshore wind farm. Located in the German North Sea, the 200MW TWBII wind farm will comprise 32 Senvion 6.2M152 wi

1 minutes read
  • LinkedIn
  • X
  • Email

Jan De Nul’s offshore installation vessel Taillevent is en route to Eemshaven in the Netherlands to start loading the first turbine components for the Trianel Windpark Borkum II (TWBII) offshore wind farm.

Located in the German North Sea, the 200MW TWBII wind farm will comprise 32 Senvion 6.2M152 wind turbines installed at the site some 40 kilometres north of the island of Borkum.

Taillevent will load the turbine components at the Buss Terminal Eemshaven, Senvion’s base for the project.

The turbine installation, initially scheduled to start mid-April, was postponed until summer after Senvion had filed for self-administration in April 2019.

By then, 15 of the 32 Senvion 6.2M152 wind turbines had already been delivered on time and transported to the base port in Eemshaven, Senvion said. The remaining 17 of the 32 wind turbines are expected to be delivered in autumn 2019.

Trianel Windpark Borkum II, the developer of the project, is owned by EWE AG with a share of 37.5 percent, and a joint venture of the power utility of the city of Zurich with 24.51 percent. The Stadtwerke-Kooperation Trianel together with 17 municipal utilities from Germany holds a share of 37.99 percent.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Wind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

25 days ago

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

26 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

25 days ago
Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

26 days ago