offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Contracts & Tenders›New OWA Tender Seeks Corrosion Protection Research
Contracts & Tenders

July 30, 2019 · about 7 years ago

New OWA Tender Seeks Corrosion Protection Research

The Carbon Trust’s Offshore Wind Accelerator (OWA) has opened a tender dedicated to corrosion protection for secondary steel components of offshore wind substructures. The selected party will be in charge of carrying out a study looking into all aspects of corrosion, including problem identification

1 minutes read
  • LinkedIn
  • X
  • Email

The Carbon Trust’s Offshore Wind Accelerator (OWA) has opened a tender dedicated to corrosion protection for secondary steel components of offshore wind substructures.

The selected party will be in charge of carrying out a study looking into all aspects of corrosion, including problem identification, available protection measures and mitigation options for secondary steel components and construction details on offshore wind substructures.

The study data will be used to develop industry guidance on the best options available and recommendations on best practice strategies for OWA partners.

Main objectives include exploring above water internal and external corrosion protection requirements and mitigation options, as well as researching the design and application of each option including reliability, in-service performance, repair needs and retrofit applicability.

Additionally, the aim of the study is constructing a corrosion protection and mitigation framework to inform the design of secondary steel components and identifying industry gaps and opportunities for further development.

The deadline for submitting applications is 27 August by 16:00 BST.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Contracts & Tenders

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker balwin
Business & Finance

Aker Solutions Nets ‘Substantial’ Offshore Wind Contract

about 1 month ago

Kent Appointed Owner’s Engineer for Buchan Floating Wind Project
Business & Finance

Kent Appointed Owner’s Engineer for Buchan Floating Wind Project

about 1 month ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker balwin
Business & Finance

Aker Solutions Nets ‘Substantial’ Offshore Wind Contract

about 1 month ago
Kent Appointed Owner’s Engineer for Buchan Floating Wind Project
Business & Finance

Kent Appointed Owner’s Engineer for Buchan Floating Wind Project

about 1 month ago