offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Wind Farm Update›First Trianel Windpark Borkum II Turbine Taking Shape
Wind Farm Update

August 2, 2019 · about 7 years ago

First Trianel Windpark Borkum II Turbine Taking Shape

Jan De Nul’s jack-up Taillevent has started installing the first wind turbine on the 200MW Trianel Windpark Borkum II (TWBII) wind farm offshore Germany. Taillevent loaded the first three sets of turbine components at Buss Terminal Eemshaven prior to transporting them to the site some 40 kilometres

1 minutes read
  • LinkedIn
  • X
  • Email

Jan De Nul’s jack-up Taillevent has started installing the first wind turbine on the 200MW Trianel Windpark Borkum II (TWBII) wind farm offshore Germany.

Taillevent loaded the first three sets of turbine components at Buss Terminal Eemshaven prior to transporting them to the site some 40 kilometres north of the island of Borkum in the German North Sea.

The wind farm will comprise a total of 32 Senvion 6.2M152 turbines installed on monopile foundations.

Senvion will deliver the final turbines to Buss Terminal Eemshaven by autumn and the wind farm is scheduled to be completed by the end of the year.

Trianel Windpark Borkum II, the developer of the project, is owned by EWE AG with a share of 37.5 percent, and a joint venture of the power utility of the city of Zurich with 24.51 percent.

The Stadtwerke-Kooperation Trianel together with 17 municipal utilities from Germany holds a share of 37.99 percent.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Wind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

25 days ago

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

26 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

25 days ago
Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

26 days ago