offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Wind Farm Update›50 Hornsea One Turbines Left to Go
Wind Farm Update

August 5, 2019 · about 7 years ago

50 Hornsea One Turbines Left to Go

124 out of 174 Siemens Gamesa 7MW turbines have been installed and commissioned at the Hornsea Project One wind farm in the UK, a spokesperson from Ørsted told Offshore WIND. Fred. Olsen Windcarrier’s jack-up vessel Bold Tern is in charge of installing 88 out of the 174 turbines, with A2SEA’s Sea Ch

1 minutes read
  • LinkedIn
  • X
  • Email

124 out of 174 Siemens Gamesa 7MW turbines have been installed and commissioned at the Hornsea Project One wind farm in the UK, a spokesperson from Ørsted told Offshore WIND.

Fred. Olsen Windcarrier’s jack-up vessel Bold Tern is in charge of installing 88 out of the 174 turbines, with A2SEA’s Sea Challenger responsible for installing the remaining 86 units.

Hornsea Project One reached the halfway turbine installation point in mid-June when the 87th turbine had been installed at the site some 120km off Yorkshire.

The 1.2GW offshore wind farm, due to become the world’s largest once fully online in 2020, saw the first turbine installed this February.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Wind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

24 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

25 days ago

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

26 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

24 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

25 days ago
Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

26 days ago