offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Wind Farm Update›Pipeshield Loads Out EA1 Second Phase Scour Protection
Wind Farm Update

August 5, 2019 · about 7 years ago

Pipeshield Loads Out EA1 Second Phase Scour Protection

Pipeshield International Ltd has loaded out the second phase scour protection for the East Anglia One offshore wind farm in the UK. Pipeshield manufactured and supplied more than 300 fronded concrete mattresses, which were loaded in stacks of six using the company’s high payload wet store bases. Usi

1 minutes read
  • LinkedIn
  • X
  • Email

Pipeshield International Ltd has loaded out the second phase scour protection for the East Anglia One offshore wind farm in the UK.

Pipeshield manufactured and supplied more than 300 fronded concrete mattresses, which were loaded in stacks of six using the company’s high payload wet store bases.

Using the specialist system meant the fronded mattresses could be loaded horizontally without compromising the frond system as if lifted in multiples in any other way could cause damage, Pipeshield said.

According to the company, a total of 34 wet store bases were provided on the project.

Pipeshield won a contract by DeepOcean in February to supply the scour protection for the 714MW offshore wind farm. Shortly after, the Lowestoft-based company secured the deal to supply the second phase scour protection.

East Anglia One will comprise 102 Siemens 7MW turbines, currently being installed at the site 59km from the coast of Lowestoft. The 714MW offshore wind farm is scheduled to come into operation in 2020.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Wind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

25 days ago

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

26 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

25 days ago
Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

26 days ago