offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Contracts & Tenders›Fugro to Probe German Offshore Wind Zones
Contracts & Tenders

September 2, 2019 · about 7 years ago

Fugro to Probe German Offshore Wind Zones

Fugro Germany Land GmbH has won a contract to provide geotechnical investigation services, including lab work, in the German North Sea and the Baltic Sea from 2019 to 2022. The tender, issued by the Federal Maritime and Hydrographic Agency (Das Bundesamt für Seeschifffahrt und Hydrographie (BSH)), w

1 minutes read
  • LinkedIn
  • X
  • Email

Fugro Germany Land GmbH has won a contract to provide geotechnical investigation services, including lab work, in the German North Sea and the Baltic Sea from 2019 to 2022.

The tender, issued by the Federal Maritime and Hydrographic Agency (Das Bundesamt für Seeschifffahrt und Hydrographie (BSH)), was divided into three lots: Geotechnical exploration North Sea 2019, Geotechnical exploration Baltic Sea 2019, Geotechnical exploration North Sea 2020 to 2022. The contract is valued at EUR 25 million.

In the North Sea 2019 lot, the survey will be conducted in two areas between the traffic separation areas German Bight Western Approach and Terschelling German Bight.

In the Baltic Sea 2019 lot, the survey will be carried out in an area 38 kilometres northeast of the island of Rügen, adjacent to Wikinger and Arkona offshore wind farms.

The geotechnical exploration works include drilling, core sampling and investigation, pressure probing, borehole geophysics, laboratory investigations, as well as documentation in the context of a preliminary investigation in accordance with the German Offshore Wind Energy Act (WindSeeG).

Drilling and pressure probing will be carried out at up to 80 meters from the seabed surface, in water depths of up to 50 meters.

The first two lots are to be completed by 15 November 2019. Lot 3 covers the investigations on a total of 15 sites from 2020 to 2022.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Contracts & Tenders

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker balwin
Business & Finance

Aker Solutions Nets ‘Substantial’ Offshore Wind Contract

about 1 month ago

Kent Appointed Owner’s Engineer for Buchan Floating Wind Project
Business & Finance

Kent Appointed Owner’s Engineer for Buchan Floating Wind Project

about 1 month ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker balwin
Business & Finance

Aker Solutions Nets ‘Substantial’ Offshore Wind Contract

about 1 month ago
Kent Appointed Owner’s Engineer for Buchan Floating Wind Project
Business & Finance

Kent Appointed Owner’s Engineer for Buchan Floating Wind Project

about 1 month ago