offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Vessels›VOS Stone Keeping Busy at Hohe See
Vessels

September 12, 2019 · about 6 years ago

VOS Stone Keeping Busy at Hohe See

Vroon’s walk-to-work (W2W) vessel VOS Stone is currently operating in the Hohe See wind farm in the German North Sea. Supporting Siemens Gamesa, VOS Stone is on duty 24/7, deploying service teams to the wind turbines, Vroon said. These operations are carried out via a gangway or by a crew transfer v

1 minutes read
  • LinkedIn
  • X
  • Email

Vroon’s walk-to-work (W2W) vessel VOS Stone is currently operating in the Hohe See wind farm in the German North Sea.

Supporting Siemens Gamesa, VOS Stone is on duty 24/7, deploying service teams to the wind turbines, Vroon said. These operations are carried out via a gangway or by a crew transfer vessel.

In addition to these duties, VOS Stone is also supplying fuel, water, and food to the jack-ups in the wind farm, with all operations performed from the Danish port of Esjberg.

Located approximately 98 kilometres from the German coast, the 497MW Hohe See wind farm covers an area of roughly 42 square kilometres, with water depths of up to 40 metres.

The wind farm comprises 71 Siemens Gamesa 7MW wind turbines the last of which was installed at the site mid-August by Fred. Olsen Windcarrier’s jack-up Blue Tern. The wind farm delivered first power mid-July.

The commissioning of all of the 71 turbines at Hohe See, as well as the 16 units at the neighboring Albatros , is expected to take place by the end of the year.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

VesselsWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

16 days ago

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

17 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

16 days ago
Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

17 days ago