offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Vessels›Ulstein Starts Working on Merkur SOV
Vessels

September 25, 2019 · about 6 years ago

Ulstein Starts Working on Merkur SOV

Norwegian shipbuilder and ship designer Ulstein has started construction work on Bernhard Schulte Offshore’s third Ulstein-designed offshore wind vessel at Ulstein Verft. As reported earlier, the partially built service operations vessel (SOV) left the Crist shipyard in Poland en route to Norway ear

2 minutes read
  • LinkedIn
  • X
  • Email

Norwegian shipbuilder and ship designer Ulstein has started construction work on Bernhard Schulte Offshore’s third Ulstein-designed offshore wind vessel at Ulstein Verft.

As reported earlier, the partially built service operations vessel (SOV) left the Crist shipyard in Poland en route to Norway earlier this month.

Following the SOV’s arrival in Ulsteinvik, Ulstein commenced work tasks such as steel outfitting, mechanical outfitting, electrical steel work, piping and insulation, with cable pulling expected to start within a few days.

Back in July 2018, GE Renewable Energy had contracted Bernhard Schulte Offshore to provide the SOV for the 396MW Merkur wind farm in the German North Sea, after which the German company placed the order with Ulstein. The expected delivery is January 2020.

Bernhard Schulte has previously received two offshore wind vessels from Ulstein. The shipowner was the first to order and introduce to the market the X-STERN aft design.

The Merkur SOV is a larger-sized vessel of the design type SX195. The vessel measures 93.4 metres in length and 18 metres in the beam and can carry up to 120 people.

The design has been customised for the tender requirements of the charterer and the ship owner’s preferred mission equipment. It has a large, centrally positioned walk-to-work motion compensated gangway and lift tower for personnel and cargo transfers. Furthermore, a 3D compensated crane capable of 2-tonne cargo lifts is available. The optimised on-board logistics includes large storage capacities, of which half is under roof in a controlled environment, and stepless approach to the offshore installations, Ulstein said.

In cooperation with the shipowner, Ulstein Design & Solutions has designed a diesel-electric propulsion system assisted by batteries to reduce operating hours on the main engines, save fuel and reduce environmental footprint.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

VesselsWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

16 days ago

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

17 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

16 days ago
Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

17 days ago