offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Grid Connection›EDS HV Wraps Up Work on Elia’s MOG
Grid Connection

September 27, 2019 · about 6 years ago

EDS HV Wraps Up Work on Elia’s MOG

EDS HV Group has completed testing, jointing and termination work at Elia’s Modular Offshore Grid (MOG) in the Belgian North Sea. EDS worked to establish a connection between the MOG’s offshore submarine cables and the onshore cables at Elia’s Stevin 380kV onshore substation in Zeebrugge. Sub-contra

1 minutes read
  • LinkedIn
  • X
  • Email

EDS HV Group has completed testing, jointing and termination work at Elia’s Modular Offshore Grid (MOG) in the Belgian North Sea.

EDS worked to establish a connection between the MOG’s offshore submarine cables and the onshore cables at Elia’s Stevin 380kV onshore substation in Zeebrugge.

Sub-contracted by cable manufacturer Hellenic Cables, EDS said it completed the preparation of two onshore transition joint bays with clean working habitats to help connect specialized 245kV cable joints with integrated fibre-optics.

The company connected the three 245kV HV and FO cable end terminations to the MOG and one to the substation of the Rentel offshore wind farm .

“I would like to thank EDS and its team for their commitment, hard work and determination. For both the clients, and Hellenic Cables, this result is of high importance as the MOG project plays a vital role for Belgium’s energy plan,” said Ioannis Stergiou , Senior Project Manager at Hellenic Cables.

Elia inaugurated the MOG in mid-September and in 2020 the grid is expected to begin gathering electricity generated by the Rentel, Northwester 2 and SeaMade offshore wind farms and transmitting it to the mainland.

It features the Offshore SwitchYard (OSY) platform, constructed by Heerema Fabrication Group, linked with the Stevin substation in Zeebrugge.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Grid Connection

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission
Cables

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission

22 days ago

Export Cable Installation Completed at Inch Cape Offshore Wind Farm
Cables

Export Cable Installation Completed at Inch Cape Offshore Wind Farm

about 1 month ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission
Cables

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission

22 days ago
Export Cable Installation Completed at Inch Cape Offshore Wind Farm
Cables

Export Cable Installation Completed at Inch Cape Offshore Wind Farm

about 1 month ago