offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Vessels›Aeolus Takes Off with First Borssele III & IV Monopiles
Vessels

October 24, 2019 · about 6 years ago

Aeolus Takes Off with First Borssele III & IV Monopiles

Van Oord’s jack-up Aeolus has sailed away from the Port of Rotterdam with the first load of monopiles for the 731.5MW Borssele III & IV offshore wind farm. Aeolus arrived at the Sif terminal on Maasvlakte 2 to load the first monopiles last week. Located some 22 kilometres off the coast of Zeeland, B

1 minutes read
  • LinkedIn
  • X
  • Email

Van Oord’s jack-up Aeolus has sailed away from the Port of Rotterdam with the first load of monopiles for the 731.5MW Borssele III & IV offshore wind farm.

Aeolus arrived at the Sif terminal on Maasvlakte 2 to load the first monopiles last week.

Located some 22 kilometres off the coast of Zeeland, Borssele III & IV will comprise 77 MHI Vestas V164 9.5MW wind turbines installed on monopiles without transition pieces.

Van Oord is the Balance of Plant (BoP) contractor responsible for the engineering, procurement, and construction of the wind farm’s foundations and inter-array cables.

The wind farm is being developed by the Blauwwind consortium comprising Partners Group (45%), Shell (20%), DGE (15%), Eneco Group (10%), and Van Oord (10%).

Shell and Eneco Group have also secured 15-year Power Purchase Agreements (PPAs) from the consortium, under which each will buy 50% of the power generated by the wind farms.

The wind farm is slated for commissioning in 2021.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

VesselsWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

16 days ago

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

17 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
Business & Finance

South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel

16 days ago
Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

17 days ago