offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Grid Connection›ABB HVDC Gear for World’s Largest Offshore Wind Farm
Grid Connection

October 30, 2019 · about 6 years ago

ABB HVDC Gear for World’s Largest Offshore Wind Farm

ABB has secured a contract to supply its high-voltage direct current (HVDC) Light® converter systems to connect the Dogger Bank offshore wind project to the UK transmission network. In the first-ever use of the HVDC technology in the UK’s offshore wind market, ABB will supply technology with one of

2 minutes read
  • LinkedIn
  • X
  • Email

ABB has secured a contract to supply its high-voltage direct current (HVDC) Light® converter systems to connect the Dogger Bank offshore wind project to the UK transmission network.

In the first-ever use of the HVDC technology in the UK’s offshore wind market, ABB will supply technology with one of the smallest environmental footprints, due to the most compact station design combined with the lowest energy losses in the power industry, the company said.

ABB will supply the HVDC Light® converter systems, while Aibel will deliver two HVDC offshore converter platforms. In 2016, ABB and Aibel announced their partnership on the design, engineering and optimization of offshore wind connections.

Developed by Equinor and SSE Renewables, the 3.6GW Dogger Bank Wind Farms consist of three offshore wind farm projects, Creyke Beck A and B, and Teesside A. Located around 130 kilometres off the UK’s North East coast each project will have a capacity of up to 1.2GW and will feature GE Haliade-X 12 MW wind turbines.

ABB has been awarded contracts for Creyke Beck A and Creyke Beck B.

“This is an important milestone for Dogger Bank with a groundbreaking HVDC technology solution enabling a competitive solution for offshore wind at a long distance from shore,” Halfdan Brustad , Vice President for Dogger Bank at Equinor, said.

”This will be the first offshore HVDC solution in the UK which opens up new markets and opportunities. The appointment of Aibel and ABB demonstrates cross industry collaboration bringing best expertise into a successful Dogger Bank delivery.”

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Grid ConnectionWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

16 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

17 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

16 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

17 days ago