offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Grid Connection›EU Okays Joint Control of Walney Extension OFTO
Grid Connection

November 5, 2019 · about 6 years ago

EU Okays Joint Control of Walney Extension OFTO

The European Commission has approved the acquisition of joint control over the transmission operator for the Walney Extension offshore wind farm by Diamond Transmission Corporation (DTC), Infrared Capital Partners (IRCP) and Chubu Electric Power. Diamond Transmission Partners Walney Extension, the h

1 minutes read
  • LinkedIn
  • X
  • Email

The European Commission has approved the acquisition of joint control over the transmission operator for the Walney Extension offshore wind farm by Diamond Transmission Corporation (DTC), Infrared Capital Partners (IRCP) and Chubu Electric Power.

Diamond Transmission Partners Walney Extension, the holding company of the offshore transmission owner, is currently solely controlled by DTC.

The Commission concluded that the proposed acquisition would raise no competition concerns because the companies’ activities do not overlap. The transaction was examined under the simplified merger review procedure.

Walney Extension comprises 40 MHI Vestas 8MW turbines and 47 Siemens Gamesa 7MW turbines located off the coast of Cumbria.

The 659MW offshore wind farm was officially inaugurated at the beginning of September last year.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Grid Connection

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden
Business & Finance

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden

20 days ago

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission
Cables

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission

22 days ago

Export Cable Installation Completed at Inch Cape Offshore Wind Farm
Cables

Export Cable Installation Completed at Inch Cape Offshore Wind Farm

about 1 month ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden
Business & Finance

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden

20 days ago
Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission
Cables

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission

22 days ago
Export Cable Installation Completed at Inch Cape Offshore Wind Farm
Cables

Export Cable Installation Completed at Inch Cape Offshore Wind Farm

about 1 month ago