offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Contracts & Tenders›CSBC-DEME Joint Venture Secures More Work in Taiwan
Contracts & Tenders

November 7, 2019 · about 6 years ago

CSBC-DEME Joint Venture Secures More Work in Taiwan

CSBC-DEME Wind Engineering (CDWE) has secured a contract for the transportation and installation of foundations at the Zhong Neng offshore wind project in Taiwan. The joint venture has also signed a Preferred Bidder Agreement (PBA) for the transportation and installation of wind turbines at the proj

1 minutes read
  • LinkedIn
  • X
  • Email

CSBC-DEME Wind Engineering (CDWE) has secured a contract for the transportation and installation of foundations at the Zhong Neng offshore wind project in Taiwan.

The joint venture has also signed a Preferred Bidder Agreement (PBA) for the transportation and installation of wind turbines at the project.

In order to implement the localization policy required by the Taiwanese government, the Zhong Neng Wind Power Corporation Preparatory Office has worked closely with CDWE, with the aim of maximizing local content, DEME said.

The 300MW Zhong Neng offshore wind farm is being developed by China Steel Corporation and is planned to be completed in 2024.

Back in December 2017, GeoSea, now part of DEME Offshore, formed CDWE with CSBC Corporation with an aim to facilitate cooperation with European companies and ensure the availability in Taiwan of foreign expertise in the fields of project and fleet management, installation techniques and marine works safety.

The joint venture secured a PBA in May for the turbine transport and installation at CIP’s Changfang and Xidao offshore wind projects. Recently, the company signed a Balance of Plant (BOP) Preferred Supplier Agreement (PSA) for the Hai Long 2 and 3 offshore wind projects.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Contracts & Tenders

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker balwin
Business & Finance

Aker Solutions Nets ‘Substantial’ Offshore Wind Contract

27 days ago

Kent Appointed Owner’s Engineer for Buchan Floating Wind Project
Business & Finance

Kent Appointed Owner’s Engineer for Buchan Floating Wind Project

27 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker balwin
Business & Finance

Aker Solutions Nets ‘Substantial’ Offshore Wind Contract

27 days ago
Kent Appointed Owner’s Engineer for Buchan Floating Wind Project
Business & Finance

Kent Appointed Owner’s Engineer for Buchan Floating Wind Project

27 days ago