offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Technology›GE Haliade-X 12MW Produces First Power in Rotterdam
Technology

November 7, 2019 · about 6 years ago

GE Haliade-X 12MW Produces First Power in Rotterdam

The GE Haliade-X 12MW prototype wind turbine located at Maasvlakte, the Port of Rotterdam, has produced its first power. According to GE, local teams will now proceed with the testing phase, during which different types of measurements will be performed to obtain a Type Certificate for the Haliade-X

1 minutes read
  • LinkedIn
  • X
  • Email

The GE Haliade-X 12MW prototype wind turbine located at Maasvlakte, the Port of Rotterdam, has produced its first power.

According to GE, local teams will now proceed with the testing phase, during which different types of measurements will be performed to obtain a Type Certificate for the Haliade-X in 2020.

The serial production of the Haliade-X 12MW turbine is expected to start in the second half of 2021.

“This first kWh is a critical achievement for our whole team, bringing to fruition our vision and all the hard work put in place,” said John Lavelle , CEO of Offshore Wind at GE Renewable Energy.

“There are more than 500 GE women and men behind this great success, who have been working for a year and a half to make this possible, and I’m taking this opportunity to thank all our partners and suppliers for their commitment and support.”

To remind, the third and final LM Wind Power 107m blade was installed on the prototype turbine at Maasvlakte in mid-October.

In addition to the prototype unit, a second Haliade-X 12MW nacelle is currently being assembled in Saint-Nazaire, France, and will soon be shipped to ORE Catapult in the UK to undergo testing.

A 107m blade was shipped to ORE Catapult in August for advanced static and fatigue-testing procedures to demonstrate its ability to withstand peak wind conditions and to simulate readiness for years of operation at sea.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Technology

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

New Company Launches Deepwater Offshore Wind Foundation Technology
Business development

New Company Launches Deepwater Offshore Wind Foundation Technology

22 days ago

Encomara’s Floating Wind Installation Technology Gets ABS Design Approval
Business development

Encomara’s Floating Wind Installation Technology Gets ABS Design Approval

about 1 month ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

New Company Launches Deepwater Offshore Wind Foundation Technology
Business development

New Company Launches Deepwater Offshore Wind Foundation Technology

22 days ago
Encomara’s Floating Wind Installation Technology Gets ABS Design Approval
Business development

Encomara’s Floating Wind Installation Technology Gets ABS Design Approval

about 1 month ago