offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Wind Farm Update›Senvion Delivers Final TWBII Turbine
Wind Farm Update

November 13, 2019 · about 6 years ago

Senvion Delivers Final TWBII Turbine

Senvion has delivered the last turbine for the Trianel Windpark Borkum II (TWBII) offshore wind project in Germany. According to Senvion, all components for the 200MW wind farm have been finished and shipped to Eemshaven. Trianel Windpark Borkum II comprises 32 Senvion 6.2M152 turbines installed on

1 minutes read
  • LinkedIn
  • X
  • Email

Senvion has delivered the last turbine for the Trianel Windpark Borkum II (TWBII) offshore wind project in Germany.

According to Senvion, all components for the 200MW wind farm have been finished and shipped to Eemshaven.

Trianel Windpark Borkum II comprises 32 Senvion 6.2M152 turbines installed on monopile foundations at the site some 40km north of the island of Borkum.

The turbine installation, initially scheduled to start mid-April, was postponed until summer after Senvion had filed for self-administration in April. Jan De Nul’s vessel Taillevent installed the first unit in August.

Trianel Windpark Borkum II, the developer of the project, is owned by EWE AG with a 37.5% share, and a joint venture of the power utility of the city of Zurich with 24.51%. The Stadtwerke-Kooperation Trianel together with 17 municipal utilities from Germany holds a share of 37.99%

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Wind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

24 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

25 days ago

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

27 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

24 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

25 days ago
Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

27 days ago