offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Grid Connection›Trelleborg to Protect Greater Changhua Cables
Grid Connection

November 26, 2019 · about 6 years ago

Trelleborg to Protect Greater Changhua Cables

Ørsted has contracted Trelleborg to provide the NjordGuard cable protection system (CPS) for the Greater Changhua 1 & 2a offshore wind project in Taiwan. Trelleborg will provide 235 NjordGuard cable protection systems and bellmouths, which will protect all inter-array and export cables on the wind f

1 minutes read
  • LinkedIn
  • X
  • Email

Ørsted has contracted Trelleborg to provide the NjordGuard cable protection system (CPS) for the Greater Changhua 1 & 2a offshore wind project in Taiwan.

Trelleborg will provide 235 NjordGuard cable protection systems and bellmouths, which will protect all inter-array and export cables on the wind farms.

Production will be carried out at Trelleborg’s manufacturing facility in the North West of England. Project engineering works will commence immediately, with installation activities scheduled for 2021.

“This is a significant achievement that marks our continued growth in renewables; a market we recognize is crucial for the world’s future energy needs,” said Andy Smith , Product Group Manager for Renewables at Trelleborg’s Applied Technologies Operation.

“This major award continues Trelleborg’s excellent relationship with Ørsted following our six-year framework for providing NjordGuard Cable Protection System on their future projects.”

The Changhua 1 and 2a offshore wind farms will feature 111 Siemens Gamesa 8MW turbines installed on jacket foundations some 35 to 50km off the coast. The projects will have a total capacity of approximately 900MW.

Van Oord is responsible for the transportation, installation, and burial of the 111 inter-array cables, with a total length of approximately 135km, and the three export cables, with a total of approximately 145 kilometres.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Grid Connection

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission
Cables

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission

22 days ago

Export Cable Installation Completed at Inch Cape Offshore Wind Farm
Cables

Export Cable Installation Completed at Inch Cape Offshore Wind Farm

29 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission
Cables

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission

22 days ago
Export Cable Installation Completed at Inch Cape Offshore Wind Farm
Cables

Export Cable Installation Completed at Inch Cape Offshore Wind Farm

29 days ago