offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Wind Farm Update›Deutsche Bucht Mono Bucket Installation Hits a Snag
Wind Farm Update

November 27, 2019 · about 6 years ago

Deutsche Bucht Mono Bucket Installation Hits a Snag

The installation of the first of two mono bucket foundations at the Deutsche Bucht offshore wind farm has been paused due to a technical issue and for further evaluation, according to Northland Power. Northland Power has emphasized that the pause does not impact the 31 turbines on monopile foundatio

1 minutes read
  • LinkedIn
  • X
  • Email

The installation of the first of two mono bucket foundations at the Deutsche Bucht offshore wind farm has been paused due to a technical issue and for further evaluation, according to Northland Power.

Northland Power has emphasized that the pause does not impact the 31 turbines on monopile foundations since the mono bucket installations are part of a pilot project designed to test the technology.

To remind, in mid-November, jack-up vessel Seajacks Scylla loaded the first mono bucket at Bladt Industries’ facility in Lindø, Denmark, preparing for installation in the German North Sea.

The 269MW Deutsche Bucht project will feature a total of 33 MHI Vestas 8.4MW turbines located some 95km northwest of the Borkum Island.

The 31 turbines installed on monopile foundations were commissioned at the end of September.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Wind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

24 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

25 days ago

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

27 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

24 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

25 days ago
Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

27 days ago