offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Wind Farm Update›Wood to Prep Equinor’s O&G Platforms for Offshore Wind
Wind Farm Update

December 11, 2019 · about 6 years ago

Wood to Prep Equinor’s O&G Platforms for Offshore Wind

Wood has been awarded a new contract by Equinor to deliver modifications to two offshore installations in the Norwegian North Sea to connect electric power from the Hywind Tampen floating wind farm. Equinor’s project replaces energy generated by gas turbines with electricity from the 88MW floating w

1 minutes read
  • LinkedIn
  • X
  • Email

Wood has been awarded a new contract by Equinor to deliver modifications to two offshore installations in the Norwegian North Sea to connect electric power from the Hywind Tampen floating wind farm.

Equinor’s project replaces energy generated by gas turbines with electricity from the 88MW floating wind farm located between the Snorre and Gullfaks fields.

As part of the three-year contract, Wood will provide the topside modifications necessary for the Snorre A and Gullfaks A platforms to integrate the Hywind Tampen with existing systems powering the facilities.

The scope of work also includes equipment installation on the floating wind turbines and upgrades to the onshore control room in Bergen which will remotely operate the wind farm.

Dave Stewart , CEO of Wood’s Asset Solutions business in Europe, Africa, Asia & Australia, said: “The Snorre A and Gullfaks A facilities will be the first oil and gas platforms to be powered by a floating offshore wind farm. We are proud to support Equinor on what is a flagship project for the North Sea’s energy transition journey.”

Hywind Tampen will comprise 11 Siemens Gamesa 8MW wind turbines mounted on floating concrete substructures. The wind farm will be able to meet around 35% of the annual power demand of the Snorre A and B, and Gullfaks A, B and C oil & gas platforms.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Wind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

26 days ago

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

27 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

26 days ago
Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

27 days ago