offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Contracts & Tenders›Vestas Turbines for Vietnamese Intertidal Wind Farm
Contracts & Tenders

December 20, 2019 · about 6 years ago

Vestas Turbines for Vietnamese Intertidal Wind Farm

The contract includes the supply and supervision of ten turbines delivered in 3.8 MW and three turbines delivered in 4.0 MW operating modes.

2 minutes read
  • LinkedIn
  • X
  • Email

Vestas has secured a contract to provide thirteen of its V150-4.2 MW turbines for a 50MW intertidal project in Vietnam’s Bạc Liêu Province for the local EPC construction company Bac Phuong JSC.

The Danish turbine maker will supervise the installation of the turbines in shallow waters close to shore in the Mekong Delta, which includes a combination of V150-4.2 MW turbines in different power ratings with site-specific towers placed on reinforced onshore foundations that are raised above sea level.

The contract includes the supply and supervision of ten turbines delivered in 3.8 MW and three turbines delivered in 4.0 MW operating modes to boost energy production for the site’s specific wind conditions. Each turbine will be equipped with a full-scale converter.

The project site is covered in water at high tide and some of the turbines will be uncovered at low tide, Vestas said.

“This project demonstrates Vestas’ ability to develop wind energy solutions that unlock high wind sites in complex and challenging environments,” said Tommaso Rovatti Studihrad , Sales Director of Vestas Asia Pacific.

“We are very proud to partner with Bac Phuong JSC and we look forward to taking part in the region’s large potential for intertidal wind projects.”

The turbine towers will be produced locally and local contractors will be used for the project, said William Gaillard, Sales Vice-President of Vestas Asia Pacific.

The project also includes a 10-year Active Output Management 5000 (AOM 5000) service agreement, designed to maximise energy production for the project. The turbine installation is expected to be completed in the first quarter of 2021.

“We have been working closely together to ensure the foundation design suitability for the marine environment and allow building the project using local labor and equipment. With the FIT deadline in November 2021 it was critical for us to find a partner that would ensure a successful and timely project completion. We believe that with the technical support and supervision from Vestas during installation of the wind turbines, Dong Hai 1 will catch the finish line ahead of time,” said Mai Trong Thinh , Chairman of Bac Phuong JSC.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Contracts & TendersWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

17 days ago

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

19 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

17 days ago
Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

19 days ago