offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Contracts & Tenders›Trianel Borkum Issues Tender for Faulty Cable Replacement
Contracts & Tenders

December 24, 2019 · about 6 years ago

Trianel Borkum Issues Tender for Faulty Cable Replacement

Trianel Windkraftwerk Borkum has issued a tender for the replacement of defective inter-array cables at the Trianel Windpark Borkum offshore wind farm in Germany. The subject of the contract is the replacement of defective inter-array cables between turbines and/or the offshore substation, including

1 minutes read
  • LinkedIn
  • X
  • Email

Trianel Windkraftwerk Borkum has issued a tender for the replacement of defective inter-array cables at the Trianel Windpark Borkum offshore wind farm in Germany.

The subject of the contract is the replacement of defective inter-array cables between turbines and/or the offshore substation, including the provision of required vessels, equipment, personnel and project execution documentation.

Furthermore, the deal will cover any port-related cable handling activities, cable testing and termination works, as well as the provision of spare parts as per request.

The contract is set to start on 1 July 2020 and end on 31 December 2025. It is set out as being 5 or 10 years, while the decision on the duration is taken during the award procedure before querying the final offer.

The deadline for submitting applications for the tender is 24 January 2020 by 12:00 local time.

The first Trianel Windpark Borkum phase comprises 40 5MW Adwen turbines which have been operational since 2015. Trianel Windpark Borkum II, currently under construction , will add 32 Senvion 6.2M152 turbines scheduled to be completed in the first half of 2020.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Contracts & TendersGrid Connection

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden
Business & Finance

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden

19 days ago

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission
Cables

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission

22 days ago

South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project
Contracts & Tenders

South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project

23 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden
Business & Finance

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden

19 days ago
Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission
Cables

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission

22 days ago
South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project
Contracts & Tenders

South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project

23 days ago