offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Maryland PSC Schedules Hearing for Project Turbine Sizes
Business & Finance

January 7, 2020 · about 6 years ago

Maryland PSC Schedules Hearing for Project Turbine Sizes

The Maryland Public Service Commission (PSC) is holding a public hearing on the potential impact of bigger turbines at the Skipjack and MarWin offshore wind projects. The event is part of the commission’s limited inquiry into impacts related to changes in the turbine sizes originally anticipated for

1 minutes read
  • LinkedIn
  • X
  • Email
Maryland PSC Schedules Hearing for Project Turbine Sizes

The Maryland Public Service Commission (PSC) is holding a public hearing on the potential impact of bigger turbines at the Skipjack and MarWin offshore wind projects.

The event is part of the commission’s limited inquiry into impacts related to changes in the turbine sizes originally anticipated for use at the two offshore wind projects.

The public comment hearing will be held on 18 January in Ocean City at 12:00 local time.

Maryland PSC called for the review as the project developers announced in the fall of 2019 that their project turbine sizes would significantly increase in rotor diameter, blade length, and overall height.

According to the commission, these selections constituted material changes to both projects and opened a limited inquiry into the potential impacts related to the turbine size variations.

To remind, the Maryland PSC awarded offshore wind renewable energy credits (ORECs) to the two projects in May 2017.

Ørsted’s 120MW Skipjack project will feature GE’s Haliade-X 12MW turbines and is expected to be fully commissioned by 2022.

US Wind’s 248MW MarWin offshore wind farm is scheduled to become operational in 2023.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Business & Finance

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden
Business & Finance

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden

23 days ago

Bernhard Schulte Offshore Takes Delivery of Fourth CSOV in Newbuild Series
Business & Finance

Bernhard Schulte Offshore Takes Delivery of Fourth CSOV in Newbuild Series

about 1 month ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden
Business & Finance

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden

23 days ago
Bernhard Schulte Offshore Takes Delivery of Fourth CSOV in Newbuild Series
Business & Finance

Bernhard Schulte Offshore Takes Delivery of Fourth CSOV in Newbuild Series

about 1 month ago