offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Contracts & Tenders›NKT Wins Service Contract for East West Interconnector
Contracts & Tenders

January 14, 2020 · about 6 years ago

NKT Wins Service Contract for East West Interconnector

NKT has secured a cable service contract with Irish power grid operator EirGrid for the East West Interconnector between Ireland and Great Britain. Under the five-year service agreement, NKT will carry out repair works for the 200kV HVDC power cable with a capacity of 500MW. The deal includes inspec

2 minutes read
  • LinkedIn
  • X
  • Email
NKT Wins Service Contract for East West Interconnector

NKT has secured a cable service contract with Irish power grid operator EirGrid for the East West Interconnector between Ireland and Great Britain.

Under the five-year service agreement, NKT will carry out repair works for the 200kV HVDC power cable with a capacity of 500MW.

The deal includes inspection and spare part maintenance, fault locating, vessel preparedness guarantee, offshore cable handling, off- and onshore cable jointing work, engineering and monitoring analysis.

The company said it will be providing jointing technicians, as well as tailored vessels, equipment and specially designed tools for service operations.

For NKT, the agreement marks the first contract including the company’s recently launched ten days vessel mobilization guarantee.

According to NKT, the service work will be carried out in accordance with a tailored preparedness plan to reduce the potential outage time in case of unexpected damages to both the onshore and offshore parts of the East West Interconnector.

“It is a pleasure to see our vessel mobilization guarantee being well-received in the market where we see a growing demand for service agreements as the focus on uptime is increasing ,” said Oliver Schlodder , Executive Vice President and Head of Applications, Service and Accessories at NKT.

“ The level of preparedness makes a critical difference for the potential downtime of a power cable and we are happy to support EirGrid with our service expertise to ensure maximum uptime of the East West Interconnector.”

The 500MW East West Interconnector, which runs between Deeside in north Wales and Woodland, County Meath in Ireland, officially opened in 2012.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Contracts & TendersGrid Connection

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission
Cables

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission

22 days ago

South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project
Contracts & Tenders

South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project

23 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission
Cables

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission

22 days ago
South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project
Contracts & Tenders

South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project

23 days ago