offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Contracts & Tenders›Tekmar Hang-Off Clamps for Scottish Offshore Wind Project
Contracts & Tenders

January 15, 2020 · about 6 years ago

Tekmar Hang-Off Clamps for Scottish Offshore Wind Project

Tekmar Energy has secured a contract to provide 221 sealed and non-sealed hang-off clamps for an offshore wind project in Scotland. Tekmar said that the work will be done for a major offshore wind project on the Scottish east coast, but the name has not been disclosed. According to the UK-based cabl

1 minutes read
  • LinkedIn
  • X
  • Email
Tekmar-Hang-Off-Clamps-for-Scottish-Offshore-Wind-Project-1

Tekmar Energy has secured a contract to provide 221 sealed and non-sealed hang-off clamps for an offshore wind project in Scotland.

Tekmar said that the work will be done for a major offshore wind project on the Scottish east coast, but the name has not been disclosed.

According to the UK-based cable protection specialist, this marks Tekmar Energy’s 10th hang-off project in offshore wind representing over 1200 systems supplied.

In the offshore wind sector, Tekmar most recently secured a contract with Van Oord to provide its cable protection system (CPS) TekLink Mechanical Latch for the Windpark Fryslân nearshore wind farm in the Netherlands.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Contracts & Tenders

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

CIP Secures 1 GW Across Two Projects in South Korea’s Offshore Wind Auction
Authorities

CIP Secures 1 GW Across Two Projects in South Korea’s Offshore Wind Auction

about 1 month ago

Aker balwin
Business & Finance

Aker Solutions Nets ‘Substantial’ Offshore Wind Contract

about 1 month ago

Kent Appointed Owner’s Engineer for Buchan Floating Wind Project
Business & Finance

Kent Appointed Owner’s Engineer for Buchan Floating Wind Project

about 1 month ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

CIP Secures 1 GW Across Two Projects in South Korea’s Offshore Wind Auction
Authorities

CIP Secures 1 GW Across Two Projects in South Korea’s Offshore Wind Auction

about 1 month ago
Aker balwin
Business & Finance

Aker Solutions Nets ‘Substantial’ Offshore Wind Contract

about 1 month ago
Kent Appointed Owner’s Engineer for Buchan Floating Wind Project
Business & Finance

Kent Appointed Owner’s Engineer for Buchan Floating Wind Project

about 1 month ago