offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Contracts & Tenders›Wanted: Offshore Platform Engineering Consultant
Contracts & Tenders

January 21, 2020 · about 6 years ago

Wanted: Offshore Platform Engineering Consultant

Elia and 50Hertz are pre-qualifying candidates for a tender call for offshore platform engineering consultancy services.

1 minutes read
  • LinkedIn
  • X
  • Email
Baltic 2 offshore substation

Elia and 50Hertz are pre-qualifying candidates for a tender call for offshore platform engineering consultancy services.

The tender winner will perform early engineering services to define the platform concept and elaborate a project design basis, based on the main contractor’s input. The project design basis will then be bundled into a complete design.

The awardee will work on the design in close cooperation with the main contractor.

The platform engineering consultant should have sufficient resources to work on multiple projects in parallel.

The awarded contract will cover a period of 96 months, with the work to be done for projects in the Belgian part of the North Sea and the German sector of the Baltic Sea.

Elia and 50Hertz have also launched a pre-qualification procedure for geotechnical seabed survey services to be delivered for the same project areas.

The deadline for submitting requests to participate in the tender seeking an offshore platform consultant is 19 February, with the invitation to tender scheduled to be issued on 5 March.

Since this joint procurement involves different countries, the state applicable national procurement law is that of Belgium.

50Hertz is part of the Elia Group. 50Hertz Transmission GmbH owns 50Hertz Offshore GmbH, which connects offshore wind farms in the Baltic Sea to the 50Hertz transmission grid.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Contracts & Tenders

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker balwin
Business & Finance

Aker Solutions Nets ‘Substantial’ Offshore Wind Contract

about 1 month ago

Kent Appointed Owner’s Engineer for Buchan Floating Wind Project
Business & Finance

Kent Appointed Owner’s Engineer for Buchan Floating Wind Project

about 1 month ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker balwin
Business & Finance

Aker Solutions Nets ‘Substantial’ Offshore Wind Contract

about 1 month ago
Kent Appointed Owner’s Engineer for Buchan Floating Wind Project
Business & Finance

Kent Appointed Owner’s Engineer for Buchan Floating Wind Project

about 1 month ago