offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Contracts & Tenders›Tekmar Kit for Kriegers Flak
Contracts & Tenders

January 22, 2020 · about 6 years ago

Tekmar Kit for Kriegers Flak

Tekmar Energy Limited has secured contract awards from Global Marine Group and JDR Cables for the supply of TekLink® cable protection systems and cable hang-off assemblies for the Kriegers Flak offshore wind farm. Global Marine Group has contracted Tekmar Energy to supply 150 patented TekLink® Mecha

1 minutes read
  • LinkedIn
  • X
  • Email
Tekmar Kit for Kriegers Flak

Tekmar Energy Limited has secured contract awards from Global Marine Group and JDR Cables for the supply of TekLink® cable protection systems and cable hang-off assemblies for the Kriegers Flak offshore wind farm.

Global Marine Group has contracted Tekmar Energy to supply 150 patented TekLink® Mechanical Latch cable protection systems to protect the subsea array cables as they interact with the monopile foundations from the seabed to surface.

Additionally, Tekmar Energy has been chosen by JDR Cables to supply 151 patented sealed hang-off clamps to secure the cables at the top of the foundations.

Russell Edmondson , Managing Director of Tekmar Energy said: “We are pleased to be working with Global Marine Group and JDR Cables on DKF. All three companies have bases in the North East of England, so this project is a great showcase for the UK supply chain and its leading position in the delivery and installation of subsea array cable systems.”

Back in November 2017, Tekmar Energy won a contract to provide J-tube bellmouths and cover disks for the wind farm’s HVAC transformer platforms.

Kriegers Flak is being developed in the Danish Baltic Sea by Vattenfall. The wind farm has a capacity of 605MW and will comprise 72 Siemens Gamesa 8MW wind turbines installed 15-40 kilometres offshore.

Vattenfall plans to start offshore construction as soon as the Danish Energy Agency grants the final approval for the project, which is expected this month.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Contracts & TendersGrid ConnectionWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

16 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

17 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

16 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

17 days ago