offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Contracts & Tenders›First Subsea Cable Protection for Neart na Gaoithe
Contracts & Tenders

February 19, 2020 · about 6 years ago

First Subsea Cable Protection for Neart na Gaoithe

DEME Group has awarded First Subsea with a contract to provide the Cable Protection System for the inter-array cables at the Neart na Gaoithe wind farm offshore Scotland. First Subsea, part of the First Tech Group based in Aberdeen, said that the cable protection system will be designed to protect t

1 minutes read
  • LinkedIn
  • X
  • Email
First Subsea Cable Protection for Neart na Gaoithe

DEME Group has awarded First Subsea with a contract to provide the Cable Protection System for the inter-array cables at the Neart na Gaoithe wind farm offshore Scotland.

First Subsea, part of the First Tech Group based in Aberdeen, said that the cable protection system will be designed to protect the cables during installation and during the operating lifespan of the wind farm, reducing cable fatigue at the point of entry into the wind turbine offshore structures.

“As a UK based company, we are delighted to be awarded this contract, 100% of our bought-out parts will be supplied by UK companies,” said John Shaw , Managing Director of First Subsea.

DEME Offshore started engineering activities at the wind farm in November 2019. The company’s scope includes the engineering, procurement, construction, and installation of the subsea cables for the 450MW wind farm, with the execution expected in 2021.

Neart na Gaoithe will consist of 54 Siemens Gamesa 8MW wind turbines scheduled for commissioning in 2023.

The wind farm is located in the North Sea approximately 15 kilometres off the coast of Fife in south-east Scotland.

The project is being developed by EDF Renewables UK and Irish electricity company ESB which has recently acquired a 50% stake in the wind farm.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Contracts & TendersWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

18 days ago

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

19 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

18 days ago
Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

19 days ago