offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Contracts & Tenders›Germans Want North Sea Hydrographic Survey Squad
Contracts & Tenders

February 21, 2020 · about 6 years ago

Germans Want North Sea Hydrographic Survey Squad

Germany’s Federal Maritime and Hydrographic Agency (BSH) has issued a tender for hydrographic investigation in the N-6 offshore wind area in the North Sea.

1 minutes read
  • LinkedIn
  • X
  • Email
Germans Want North Sea Hydrographic Survey Squad

Germany’s Federal Maritime and Hydrographic Agency (BSH) has issued a tender for hydrographic investigation in the N-6 offshore wind area in the North Sea.

The seafloor investigation is part of the geological preliminary investigation at the site and includes data acquisition, data processing, evaluation, and documentation.

The work will be done at two sites located in the German Exclusive Economic Zone (EEZ) located at approximately 100km2.

According to the published tender , the contract will begin on 1 May and end on 31 December.

The deadline for submitting applications is 1 April by 10:00 local time.

In September 2019, BSH announced it is launching the next round of preliminary investigations on the two offshore wind farm areas, N-6.6 and N-6.7.

N-6.6 is expected to support a capacity of 630MW and the area N-6.7 will support a wind farm with a capacity of 270MW.

The two areas for the investigation were defined in BSH’s Surface Development Plan 2019. Over the next few years, BSH will commission and partly carry out investigations into the marine environment and the subsoil, wind, waves, and other oceanographic parameters at these sites.

If deemed suitable, the areas will be tendered in 2024 and put into operation in 2029.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Contracts & Tenders

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker balwin
Business & Finance

Aker Solutions Nets ‘Substantial’ Offshore Wind Contract

about 1 month ago

Kent Appointed Owner’s Engineer for Buchan Floating Wind Project
Business & Finance

Kent Appointed Owner’s Engineer for Buchan Floating Wind Project

about 1 month ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker balwin
Business & Finance

Aker Solutions Nets ‘Substantial’ Offshore Wind Contract

about 1 month ago
Kent Appointed Owner’s Engineer for Buchan Floating Wind Project
Business & Finance

Kent Appointed Owner’s Engineer for Buchan Floating Wind Project

about 1 month ago