offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Vessels›Normand Clipper to Feature Royal IHC Cable Lay Spread
Vessels

February 26, 2020 · about 6 years ago

Normand Clipper to Feature Royal IHC Cable Lay Spread

Global Marine Group has awarded Royal IHC with a contract to design and deliver an integrated power cable lay spread for the newly chartered vessel Normand Clipper. According to Royal IHC, the spread is optimized for inter-array cable lay and includes a patented quadrant handling system for second-e

1 minutes read
  • LinkedIn
  • X
  • Email
Normand Clipper to Feature Royal IHC Cable Lay Spread

Global Marine Group has awarded Royal IHC with a contract to design and deliver an integrated power cable lay spread for the newly chartered vessel Normand Clipper.

According to Royal IHC, the spread is optimized for inter-array cable lay and includes a patented quadrant handling system for second-end deployment operations.

The equipment includes IHC’s 15Te break-back tensioners and an overarching control system. This integrates the control of the carousel, tensioners and quadrant handling system, which is said to enhance efficiency by reducing the required number of operators.

IHC said it will provide the equipment within an accelerated delivery period together with KCI, its independent engineering subsidiary.

The tensioners will be provided on a long-term charter agreement from the company’s base in Newcastle.

“ We are very pleased to bring our new vessel, Normand Clipper, into service in the first quarter of 2020,” said Martyn Drye , Director of Engineering Director at Global Marine Group.

“ Royal IHC is the ideal partner to deliver the cable array deck spread, with their unique ability to supply new and existing equipment as a turnkey package in a short timescale. The fully integrated control system, with active heave compensation ensures that we will maximise our installation capability and protect our customers cables effectively.”

Normand Clipper is set to carry out inter-array cable installation at the Kriegers Flak offshore wind project in Denmark this summer.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Vessels

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

19 days ago

South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project
Contracts & Tenders

South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project

24 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

19 days ago
South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project
Contracts & Tenders

South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project

24 days ago