offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Wind Farm Update›Geophysical Surveys Wrapping Up Offshore North Carolina
Wind Farm Update

February 27, 2020 · about 6 years ago

Geophysical Surveys Wrapping Up Offshore North Carolina

Geophysical surveys at the Kitty Hawk offshore wind project off North Carolina are being completed along with the associated cable-laying, Iberdrola said. According to Iberdrola’s 2019 financial results, the project is continuing apace and high-definition digital bird surveys have been carried out o

1 minutes read
  • LinkedIn
  • X
  • Email
Geophysical Surveys Wrapping Up Offshore North Carolina

Geophysical surveys at the Kitty Hawk offshore wind project off North Carolina are being completed along with the associated cable-laying, Iberdrola said.

According to Iberdrola’s 2019 financial results, the project is continuing apace and high-definition digital bird surveys have been carried out over the last 12 months.

The company’s subsidiary Avangrid Renewables submitted an application to the U.S. Bureau of Ocean Energy Management (BOEM) in October 2019 for permission to install equipment to measure wind speeds and sea conditions at the 495km2 area.

Approval is expected to be received in the spring this year, with the roll-out following shortly after.

To remind, Avangrid secured the rights to develop the 122,405-acre lease area in May 2017. It has a potential generating capacity of 1,486MW and is the first offshore wind lease area to be secured off North Carolina.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Wind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

25 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

26 days ago

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

27 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

25 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

26 days ago
Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

27 days ago