offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Grid Connection›ABB Gear for DolWin5
Grid Connection

March 5, 2020 · about 6 years ago

ABB Gear for DolWin5

ABB has won a EUR 10.6 million order for ABB Ability™ digital products and services at TenneT’ DolWin5 (Epsilon) grid connection in the German North Sea. Under the order, ABB will provide a system for IT infrastructure, OT1 security, plant-wide condition monitoring, SCADA2, and remote access service

1 minutes read
  • LinkedIn
  • X
  • Email
ABB Gear for DolWin5

ABB has won a EUR 10.6 million order for ABB Ability™ digital products and services at TenneT’ DolWin5 (Epsilon) grid connection in the German North Sea.

Under the order, ABB will provide a system for IT infrastructure, OT1 security, plant-wide condition monitoring, SCADA2, and remote access services to facilitate stable power transmission to the German national grid.

The DolWin5 (Epsilon) platform will deliver 900MW of electricity from three connected wind farms in the North Sea, 100 kilometres off the German coast.

In addition to a converter platform offshore, there is an onshore converter station located in Emden/Ost in Germany.

“This order enables ABB to leverage its expertise in remote, unmanned operations and advanced digital services with the shift to a more diversified energy mix,” said Per Erik Holsten , Managing Director, ABB Norway.

“With our intelligent project delivery experience, ABB is uniquely positioned to assure the safety, security and reliability of renewable assets worldwide. We look forward to supporting the delivery of clean, efficient power for Germany’s energy transition.”

ABB received the order from Aibel Keppel consortium ANS5 in Norway. Aibel/Keppel FELS consortium will design, construct, and build the High Voltage Direct Current transmission system.

Initial operations for DolWin5 (Epsilon) are due to commence in 2024, ABB said.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Grid ConnectionTechnology

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden
Business & Finance

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden

17 days ago

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission
Cables

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission

19 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden
Business & Finance

Dutch Cable Services Firm Moves Closer to Baltic Clients with Hub in Sweden

17 days ago
Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission
Cables

Van Oord and Sumitomo Sign HVDC Subsea Cable Systems Deal with SSEN Transmission

19 days ago