offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Contracts & Tenders›Tekmar Cracks French Offshore Wind Market with Saint-Nazaire Order
Contracts & Tenders

March 12, 2020 · about 6 years ago

Tekmar Cracks French Offshore Wind Market with Saint-Nazaire Order

Tekmar Energy Limited has won a contract from French cable installation specialist Louis Dreyfus TravOcean to supply TekLink® cable protection systems (CPS) for the Saint-Nazaire offshore wind farm in France. Saint-Nazaire is a 480MW offshore wind farm set for construction off France’s Atlantic Coas

1 minutes read
  • LinkedIn
  • X
  • Email
Tekmar Cracks French Offshore Wind Market with Saint-Nazaire Order

Tekmar Energy Limited has won a contract from French cable installation specialist Louis Dreyfus TravOcean to supply TekLink® cable protection systems (CPS) for the Saint-Nazaire offshore wind farm in France.

Saint-Nazaire is a 480MW offshore wind farm set for construction off France’s Atlantic Coast and owned by EDF Renewables and Enbridge. It will be the first commercial-scale wind farm installed in French waters.

Saint-Nazaire also marks Tekmar Energy’s first offshore wind project in France and the company’s first contract with La Ciotat-based Louis Dreyfus TravOcean.

Tekmar Energy will supply 160 patented TekLink® Mechanical Latch CPS to protect the 33kV inter-array cables manufactured by Louis Dreyfus TravOcean’s consortium partner Prysmian Group.

Russell Edmondson , Managing Director of Tekmar Energy said: “We are thrilled to secure our first contract in France and pleased that Louis Dreyfus TravOcean has selected Tekmar Energy’s industry-leading TekLink CPS for Saint-Nazaire, a project characterised by its rocky seabed that requires the most robust and dependable cable protection solution.”

The Saint-Nazaire offshore wind farm, also known as Parc du Banc de Guérande, will comprise 80 GE Haliade 150-6MW turbines manufactured in France and scheduled to be operational in 2022.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Contracts & TendersWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

18 days ago

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

19 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

18 days ago
Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

19 days ago