offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Wind Farm Update›Tekmar Delivers SeaMade CPS to DEME
Wind Farm Update

March 20, 2020 · about 6 years ago

Tekmar Delivers SeaMade CPS to DEME

Tekmar Energy Limited has completed the delivery of TekLink® cable protection systems to DEME Offshore for the SeaMade offshore wind farm in Belgium. SeaMade is a 487MW offshore wind farm currently under construction off the coast of Belgium and integrates two wind farm sites known as Mermaid and Se

1 minutes read
  • LinkedIn
  • X
  • Email
Tekmar Delivers SeaMade CPS to DEME

Tekmar Energy Limited has completed the delivery of TekLink® cable protection systems to DEME Offshore for the SeaMade offshore wind farm in Belgium.

SeaMade is a 487MW offshore wind farm currently under construction off the coast of Belgium and integrates two wind farm sites known as Mermaid and Seastar.

Tekmar Energy was awarded a contract from DEME Offshore to supply 136 patented TekLink® Mechanical Latch cable protection systems and bellmouths for application on both J-Tube and J-Tubeless inter-array cable pull-ins.

The systems were delivered in January 2020 from the company’s manufacturing facility in Newton Aycliffe, UK.

Engineering and design verification was performed by Tekmar Group Company, AgileTek Engineering, from their offices in London, UK.

Jack Simpson , Director of Tekmar Energy, said: “SeaMade is Tekmar Energy’s 8th offshore wind project in Belgium and our 80th offshore wind project worldwide. This project sees Tekmar Energy continuing to provide industry-leading protection solutions to the European offshore wind market whilst further strengthening our relationship with long-standing customer DEME.”

SeaMade will comprise 58 Siemens Gamesa 8.0-167 DD turbines set to be commissioned by the end of 2020.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Wind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

26 days ago

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

27 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

26 days ago
Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

27 days ago