offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›Port of Amsterdam to Build Offshore Wind Hub
Operations & Maintenance

April 17, 2020 · about 6 years ago

Port of Amsterdam to Build Offshore Wind Hub

The Port of Amsterdam will turn a dredging depot at the former Averijhaven into an energy port to serve as a base for the construction and maintenance of offshore wind farms. The port is carrying out the Energiehaven project in collaboration with the province of North Holland, the municipality of Ve

1 minutes read
  • LinkedIn
  • X
  • Email
Port of Amsterdam to Build Offshore Wind Hub

The Port of Amsterdam will turn a dredging depot at the former Averijhaven into an energy port to serve as a base for the construction and maintenance of offshore wind farms.

The port is carrying out the Energiehaven project in collaboration with the province of North Holland, the municipality of Velsen, Tata Steel, and the Port of IJmuiden.

Energiehaven will spread over 15 hectares and comprise both the area of ​​the Averijhaven and Tata Steel’s 5-hectare site to set up a public harbour area for offshore wind.

The site is located on the North Seaside, in front of the sea locks in IJmuiden.

The location is described as ideal for the construction and servicing of the Hollandse Kust West and IJmuiden Ver offshore wind farms, among others, the port said.

Energiehaven will feature a quay of 580 metres, 200 metres of which will be a heavy-duty quay with a water depth of 12.5 metres. The remaining 380 metres will be a standard quay with a water depth of ten metres.

The work on developing the project will start in 2020. The next steps in the project will be to empty the dredging depot at the former Averijhaven and to carry out an Environmental Impact Assessment for the project.

The Port of Amsterdam and Zeehaven IJmuiden will operate Energiehaven once completed.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Operations & MaintenancePorts & Logistics

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

14 days ago

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

14 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

14 days ago
Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

14 days ago