offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Wind Farm Update›Geotechnical Survey Wraps Up at Oriel Offshore Wind Project
Wind Farm Update

April 20, 2020 · about 6 years ago

Geotechnical Survey Wraps Up at Oriel Offshore Wind Project

Geoquip AS has completed a geotechnical survey campaign at the Oriel offshore wind project in Ireland. The month-long campaign complements the geophysical survey completed by Alpha Marine in August last year. Data collected during these surveys contributes to the foundation design, as well as also t

1 minutes read
  • LinkedIn
  • X
  • Email
Geotechnical Survey Wraps Up at Oriel Offshore Wind Project

Geoquip AS has completed a geotechnical survey campaign at the Oriel offshore wind project in Ireland.

The month-long campaign complements the geophysical survey completed by Alpha Marine in August last year.

Data collected during these surveys contributes to the foundation design, as well as also the future wind farm layout.

According to Parkwind, the outbreak of the COVID-19 crisis in the midst of the geotechnical campaign led to the implementation of strict additional safety measures on board to ensure operations were executed in a safe manner.

This included the requirement for the drilling ship to stay offshore for the duration of the campaign.

“Lead developer Parkwind and its partner ESB continue to invest in these crucial surveys to be in a position to deliver on the timing for offshore wind put forward by the Irish government in its Climate Action Plan and leading up to the RESS auction scheduled for 2021,” said Peter Caluwaerts , Parkwind’s Project Director.

Parkwind got onboard the Oriel project in October 2017 , when it agreed on investment to become a strategic partner in the 330 MW offshore wind farm.

At the beginning of 2019, ESB reached an agreement with Parkwind to acquire an up to 35% stake in the project. Oriel is planned to begin commercial operations in the early 2020s.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Wind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

26 days ago

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

27 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

26 days ago
Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

27 days ago