offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Grid Connection›Rotech Subsea Completes Walney Cable Job
Grid Connection

April 20, 2020 · about 6 years ago

Rotech Subsea Completes Walney Cable Job

Rotech Subsea has completed a cable burial scope for Ørsted at the Walney offshore wind farm in the Irish Sea. Rotech said it was responsible for all operations for the project, from chartering the vessel to contracting all relevant parties. The UK company provided its TRS1LD Jet Trenching tool, equ

1 minutes read
  • LinkedIn
  • X
  • Email
Rotech Subsea Completes Walney Cable Job

Rotech Subsea has completed a cable burial scope for Ørsted at the Walney offshore wind farm in the Irish Sea.

Rotech said it was responsible for all operations for the project, from chartering the vessel to contracting all relevant parties.

The UK company provided its TRS1LD Jet Trenching tool, equipped with HP jets, to carry out the cable burial at the wind farm.

The subsea spread of equipment was mobilized on the OSV Relume and deployed using the vessel’s crane.

Two separate cables, totaling approximately 3.5km in length, were trenched to a specification of 2.0m TOC in the soft sand areas and to 1.0m TOC in the Stiff Clay areas, Rotech said.

“This was a great project for Rotech Subsea as it saw us take on the role of contractor, chartering our own vessel and engaging all the relevant parties required to make the project a success,” said Rotech Subsea Director Stephen Cochrane .

“The TRS1LD Jet Trenching tool sets itself apart from mass-flow excavation tools because its patented design produces narrower, higher pressure jets which are up to seven times more powerful than some other excavation systems. This facilitated the scope being completed extremely efficiently and on budget.”

The 367 MW Walney offshore wind farm comprises 102 Siemens turbines that were put into operation in 2012.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Grid ConnectionWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

16 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

17 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

16 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

17 days ago