offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Technology›China’s First 8 MW Wind Turbine Stands Offshore
Technology

April 28, 2020 · about 6 years ago

China’s First 8 MW Wind Turbine Stands Offshore

China’s first 8 MW wind turbine has been installed at the Xinghua Bay Project Phase II off Fujian, the wind turbine maker Goldwind said. The GW175-8.0 unit was installed at the site on Tuesday, 28 April. According to Goldwind, it is the latest generation of large-capacity offshore wind turbines with

1 minutes read
  • LinkedIn
  • X
  • Email
China's First 8 MW Wind Turbine Stands Offshore

China’s first 8 MW wind turbine has been installed at the Xinghua Bay Project Phase II off Fujian, the wind turbine maker Goldwind said.

The GW175-8.0 unit was installed at the site on Tuesday, 28 April.

According to Goldwind, it is the latest generation of large-capacity offshore wind turbines with full independent intellectual property, which sets a new record for the unit capacity of China’s offshore wind turbine.

The Goldwind 8 MW turbine has a rotor diameter of 175 metres and is applicable to wind class IEC I.

Goldwind launched the prototype 8 MW unit at its facility in Fujian in September 2019.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

TechnologyWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

13 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

14 days ago

Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution
Business development

Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution

15 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

13 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

14 days ago
Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution
Business development

Inside the High-Productivity Rolling Technologies Driving the Offshore Wind Evolution

15 days ago