offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Authorities›600 MW OWF in Gulf of Mexico Would Bring 4,470 Jobs and USD 445 Million – Study
Authorities

May 5, 2020 · about 6 years ago

600 MW OWF in Gulf of Mexico Would Bring 4,470 Jobs and USD 445 Million – Study

A 600 MW offshore wind farm in the Gulf of Mexico, with a commercial operation date of 2030, would bring some 4,470 jobs and USD 445 million in gross domestic product (GDP) during construction, according to a study released by the U.S. Bureau of Ocean Energy Management (BOEM). During the operational

2 minutes read
  • LinkedIn
  • X
  • Email
A map outlining the studies areas in Gulf of Mexico

A 600 MW offshore wind farm in the Gulf of Mexico, with a commercial operation date of 2030, would bring some 4,470 jobs and USD 445 million in gross domestic product (GDP) during construction , according to a study released by the U.S. Bureau of Ocean Energy Management (BOEM).

During the operational stage, a project of this capacity would create around 150 ongoing jobs and bring in USD 14 million annually.

BOEM’s Gulf of Mexico OCS office issued two new studies on renewable energy in the Gulf of Mexico at the end of April, developed in cooperation with the National Renewable Energy Laboratory (NREL).

In the Offshore Renewable Energy Technologies in the Gulf of Mexico study, different offshore renewable energy technologies were analysed to determine which are best suited for development in the Gulf of Mexico.

The renewable energy resources evaluated included wind, wave, tidal, current, solar, deepwater source cooling, and hydrogen.

Offshore wind was identified as the leading technology, as it showed the greatest resource potential for the Gulf of Mexico and is the most mature technology of those analysed for the region, according to BOEM.

Following the identification of the most suitable technology, BOEM and NREL further analysed its economic feasibility for selected sites in the Gulf of Mexico.

In the Offshore Wind in the U.S. Gulf of Mexico: Regional Economic Modeling & Site-Specific Analyses study, BOEM and NREL analysed the economic impact of a 600 MW project at a reference site with a commercial operation date of 2030.

The site-specific economic analysis indicated that a single offshore wind project of this size could support approximately 4,470 jobs and USD 445 million in gross domestic product (GDP) during construction and an ongoing 150 jobs and USD 14 million annually from operation and maintenance labor, materials, and services.

The analysis did not include the likely further jobs or impacts in the Gulf of Mexico that may be created while supporting offshore wind projects built in other regions of the U.S., or the world.

NREL announced back in 2017 that it would carry out a survey to examine the feasibility of various potential offshore renewable energy resources in the Gulf of Mexico, primarily offshore wind.

The results of the two studies issued in April 2020 will inform Federal, State, and local strategic renewable energy planning over the next decade, BOEM said.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

AuthoritiesR&D

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

New Company Launches Deepwater Offshore Wind Foundation Technology
Business development

New Company Launches Deepwater Offshore Wind Foundation Technology

21 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

New Company Launches Deepwater Offshore Wind Foundation Technology
Business development

New Company Launches Deepwater Offshore Wind Foundation Technology

21 days ago