offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Vessels›LOC Provides Design for New Woen Jinn Cable-Laying Vessel
Vessels

May 18, 2020 · about 6 years ago

LOC Provides Design for New Woen Jinn Cable-Laying Vessel

Longitude Engineering, part of LOC Group, has provided the concept and basic design services for Woen Jinn Harbor Engineering’s new DP2 cable-laying vessel that will service the Taiwanese offshore wind market. Longitude Engineering also provided construction specifications for yard engagement and pr

1 minutes read
  • LinkedIn
  • X
  • Email
LOC Provides Design for New Woen Jinn Cable-Laying Vessel

Longitude Engineering, part of LOC Group, has provided the concept and basic design services for Woen Jinn Harbor Engineering’s new DP2 cable-laying vessel that will service the Taiwanese offshore wind market.

Longitude Engineering also provided construction specifications for yard engagement and procurement activities.

The DP2 oceangoing vessel design, with a focus on cable operations in Taiwan’s environmental conditions, has received approval-in-principal by ABS and CR Class, the company said.

The back deck was specifically designed to be suitable for inter-array and export cables, as well as repair work.

“This was a complicated project that needed to meet very specific requirements from various stakeholders,” said Danny Ng , Project Manager for Longitude Engineering.

“To deliver this project, we pooled resources across our UK and Singapore offices, combining experienced operational surveyors from LOC Renewables, with the cable lay design experience of Longitude UK, and the design capabilities of Longitude Singapore.”

Prior to the design, Longitude evaluated Woen Jinn’s current assets and potential conversions to meet the operational criteria.

As reported back in 2018, Woen Jinn secured a contract with Ørsted for the inter-array cable installation at the Greater Changhua offshore wind projects, which includes a special financial arrangement that allows WJ to invest in the new-build cable-laying vessel WoenJinn#7.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Vessels

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

19 days ago

South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project
Contracts & Tenders

South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project

24 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

19 days ago
South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project
Contracts & Tenders

South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project

24 days ago