offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Wind Farm Update›Final WindFloat Atlantic Turbine En Route to Project Site
Wind Farm Update

May 28, 2020 · about 6 years ago

Final WindFloat Atlantic Turbine En Route to Project Site

The third and final floating wind turbine for the WindFloat Atlantic project has set sail from Spain to the project site offshore Portugal. The turbine will be traveling from the Port of Ferrol towards its final destination 20km off Viana do Castelo on a journey that will take three days. At the pro

1 minutes read
  • LinkedIn
  • X
  • Email
WindFloat Atlantic

The third and final floating wind turbine for the WindFloat Atlantic project has set sail from Spain to the project site offshore Portugal.

The turbine will be traveling from the Port of Ferrol towards its final destination 20km off Viana do Castelo on a journey that will take three days.

At the project site, this final turbine will join two units that are already supplying green energy to Portugal’s electricity network.

The first WindFloat Atlantic turbine was installed in October last year and the second one arrived at the site this January.

The first unit was connected to the grid on 31 December 2019 and began generating power immediately after that.

The 25 MW project, which comprises MHI Vestas 8.4 MW turbines on Principle Power’s semi-submersible foundations, is the first floating wind farm in continental Europe.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Wind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

25 days ago

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

27 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

25 days ago
Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

27 days ago