offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Contracts & Tenders›Lloyd’s Register to Work on Human-Machine Interface for Hywind Tampen’s Control Room
Contracts & Tenders

June 24, 2020 · about 6 years ago

Lloyd’s Register to Work on Human-Machine Interface for Hywind Tampen’s Control Room

Lloyd’s Register has been contracted for Human-Machine Interface (HMI) engineering services for the control room from which the Hywind Tampen floating wind farm will be remotely operated. The company will provide consultancy design services for integration into the onshore control room (OCR) for the

2 minutes read
  • LinkedIn
  • X
  • Email
Artist's impression of Hywind Tampen floating wind farm and the Snorre platform

Lloyd’s Register has been contracted for Human-Machine Interface (HMI) engineering services for the control room from which the Hywind Tampen floating wind farm will be remotely operated.

The company will provide consultancy design services for integration into the onshore control room (OCR) for the Hywind Tampen floating wind farm in Norway, as well as human factor analysis for the new OCR and existing OCRs for four platforms.

The Hywind Tampen control room is co-located with the OCR for Valemon, Equinor’s unmanned platform with separation facilities for gas, condensate and water.

“The work we are undertaking, providing design consultancy for the existing OCR and human factor analysis, will help support Equinor’s wider decarbonisation agenda. By developing unmanned solutions for power generation, the industry can start to make some real cost savings” , said Tristan Chapman , SVP Clean Energy and Innovation at Lloyd’s Register.

The services Lloyd’s Register will provide for Hywind Tampen control room are part of an integrated scope Equinor awarded to Wood .

Wood’s scope includes topside modifications necessary for the Snorre A and Gullfaks A platforms to integrate the Hywind Tampen with existing systems powering the facilities, equipment installation on the floating wind turbines, and upgrades to the OCR in Bergen.

The almost EUR 500 million project is the first to power oil & gas platforms by a floating wind farm.

Norwegian Ministry of Petroleum and Industry approved Equinor’s plans for development and operation of the Hywind Tampen project in April.

Hywind Tampen will comprise eleven Siemens Gamesa SG 8.0-167 DD wind turbines, installed some 140 kilometres off Norwegian coast, in water depths ranging from 260 to 300 between the Snorre and Gullfaks oil and gas platforms.

The project is scheduled to come online in late 2022.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Contracts & TendersOperations & Maintenance

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

14 days ago

South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project
Contracts & Tenders

South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project

19 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

14 days ago
South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project
Contracts & Tenders

South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project

19 days ago