offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Vessels›Ulstein Delivers Windea Jules Verne SOV
Vessels

June 24, 2020 · about 6 years ago

Ulstein Delivers Windea Jules Verne SOV

Ulstein Verft has delivered the Service Operation Vessel (SOV) Windea Jules Verne to Bernhard Schulte Offshore, who chartered the hybrid vessel to GE Renewable Energy for operations at the Merkur offshore wind farm in Germany. Based on the ULSTEIN SX195 design, Windea Jules Verne is 93.4 metres long

1 minutes read
  • LinkedIn
  • X
  • Email
Windea Jules Verne at quayside at Ulstein Verft

Ulstein Verft has delivered the Service Operation Vessel (SOV) Windea Jules Verne to Bernhard Schulte Offshore, who chartered the hybrid vessel to GE Renewable Energy for operations at the Merkur offshore wind farm in Germany.

Based on the ULSTEIN SX195 design, Windea Jules Verne is 93.4 metres long, has a beam of 18 metres, and can accommodate up to 120 people.

The vessel, powered by a diesel-electric hybrid system, is equipped with a tower holding a personnel and equipment elevator, and a heave compensated gangway for transfer to offshore wind turbines. The SOV can move in reverse, with the stern first, when operating infield. As an add-on, the vessel will use a daughter craft to further increase the service capacity, according to Ulstein.

GE Renewable Energy contracted Bernhard Schulte to provide an SOV for the 396 MW Merkur project in July 2018, after which the German vessel owner and operator placed an order with Ulstein.

Ulstein Verft began working on the SOV in September 2019 and completed final tests and sea trials at the shipyard in Norway this spring.

In March, the vessel was named Windea Jules Verne , after one of the world’s most popular adventure writers, who was born in Nantes, France, where GE’s Offshore Wind business is located.

At the Merkur offshore wind farm, the Windea Jules Verne will support operations and maintenance (O&M) of the 66 GE Haliade 150-6 MW turbines.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Vessels

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

19 days ago

South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project
Contracts & Tenders

South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project

24 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

19 days ago
South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project
Contracts & Tenders

South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project

24 days ago