offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Ports & Logistics›Watch: Samkang Sends Off TPC Jackets
Ports & Logistics

June 29, 2020 · about 6 years ago

Watch: Samkang Sends Off TPC Jackets

Following the first load-out of the jacket foundations built by Samkang M&T for the TPC Phase 1 wind farm in Taiwan, the South Korean manufacturer has now shared a video showing the process. Back in May, Jan De Nul completed the load-out of the first four of the 21 jacket foundations built for the 1

1 minutes read
  • LinkedIn
  • X
  • Email
Watch: Samkang Sends Off TPC Jackets

Following the first load-out of the jacket foundations built by Samkang M&T for the TPC Phase 1 wind farm in Taiwan, the South Korean manufacturer has now shared a video showing the process.

Back in May, Jan De Nul completed the load-out of the first four of the 21 jacket foundations built for the 109.2 MW TPC (Taiwan Power Company) Offshore Windfarm Phase 1 at Samkang’s yard.

The four-legged jackets are being shipped in five batches of three to five units on a self-propelled semi-submersible transport vessel. Jan De Nul tapped Taiwan’s Hung Hua for the transport of the jackets.

The jackets measure between 55 and 62 metres in overall length. The heaviest unit weighs approximately 1,100 tonnes, and the combined total weight is approximately 22,000 tonnes.

Each jacket includes a 7.2-metre transition piece (TP) with a diameter of 5.4 metres to support towers carrying the Hitachi 5.2 MW turbines.

Once in Taiwan, the jackets will be custom cleared before travelling to their final destination approximately 8 kilometres off the coast of Fangyuan in Central Western Taiwan, where Jan De Nul is responsible for their installation.

The wind farm is scheduled to be completed by the end of the year.

The video of the load-out of the jacket foundations can be accessed here .

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Ports & LogisticsWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

13 days ago

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

14 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

13 days ago
Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

14 days ago