offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›R&D›Balmoral Unveils Integrated Cable Protection System
R&D

July 14, 2020 · about 6 years ago

Balmoral Unveils Integrated Cable Protection System

Aberdeen-based Balmoral has developed an integrated cable protection system (CPS) that the engineering company describes as unique. The patented system is available in three standard sizes and includes a combination of bend restrictors and a bend stiffener, foundation interface device, standard dyna

1 minutes read
  • LinkedIn
  • X
  • Email
Balmoral Unveils Integrated Cable Protection System

Aberdeen-based Balmoral has developed an integrated cable protection system (CPS) that the engineering company describes as unique.

The patented system is available in three standard sizes and includes a combination of bend restrictors and a bend stiffener, foundation interface device, standard dynamic unit, and a detachable pull head.

All of the components are designed, manufactured, and brought together in-house before being tested on the company’s test rig, Balmoral said.

Solutions for varying apertures on monopile installations are available as well as J-tube and I-tube options for jacket structures, the company said.

“Our systems are designed based on the fatigue limit state (FLS) and offer something different because of their unique diverless removal feature and the ability to account for free span caused by scour development ,” Dr Aneel Gill , product R&D manager, said.

“Our patented fibre reinforced technology adds stiffness to the system controlling the curvature during the project lifespan. This reduces the amount of movement experienced by the cable, improving fatigue performance and greatly reducing the risk of failure through the life of field.”

According to Dr Geel, the system’s low weight components allow for efficient transportation, handling, and assembly on deck.

“The system also allows for diverless removal of the CPS should cable maintenance be required,” Dr Geel said.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

R&D

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

New Company Launches Deepwater Offshore Wind Foundation Technology
Business development

New Company Launches Deepwater Offshore Wind Foundation Technology

21 days ago

A photo of the Rampion offshore wind farm off Brighton, UK, in sunrise
Featured

Ten Most Read News on offshoreWIND.biz in 2025

about 6 months ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

New Company Launches Deepwater Offshore Wind Foundation Technology
Business development

New Company Launches Deepwater Offshore Wind Foundation Technology

21 days ago
A photo of the Rampion offshore wind farm off Brighton, UK, in sunrise
Featured

Ten Most Read News on offshoreWIND.biz in 2025

about 6 months ago