offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Contracts & Tenders›Zhong Neng Offshore Wind Project to Feature Locally-Made Pin Piles
Contracts & Tenders

July 17, 2020 · about 6 years ago

Zhong Neng Offshore Wind Project to Feature Locally-Made Pin Piles

CTCI Machinery Corporation (CTCI MAC) has signed a contract with China Steel Power Corporation to supply nearly a hundred pin piles for the Zhong Neng offshore wind project in Taiwan. Four production lines will be set up at CTCI MAC’s Ta-Lin Shop in Kaohsiung’s Nansing Free Trade Zone. The pin piles

1 minutes read
  • LinkedIn
  • X
  • Email
Zhong Neng Offshore Wind Project to Feature Locally-Made Pin Piles

CTCI Machinery Corporation (CTCI MAC) has signed a contract with China Steel Power Corporation to supply nearly a hundred pin piles for the Zhong Neng offshore wind project in Taiwan.

Four production lines will be set up at CTCI MAC’s Ta-Lin Shop in Kaohsiung’s Nansing Free Trade Zone. The pin piles are expected to be ready for load out from March 2023 onwards.

“Thanks to our previous experience in offshore wind projects, we are now capable of carrying out simultaneous welding tasks with four -SAW welding machines on sections even with various section diameters,” said CTCI MAC Chairman Yun-Peng Tan .

China Steel Power Corporation, a joint venture of Taiwan’s China Steel Corporation and Denmark’s Copenhagen Infrastructure Partners (CIP), is developing Zhong Neng off the Changhua coast in central Taiwan.

Commercial operation of the 300 MW wind farm is expected to begin in 2024.

According to CTCI MAC, the project is committed to delivering all 27 localization items required by the Taiwanese government, making it one of the offshore wind farms with the highest level of localization in the industry.

MHI Vestas has been selected as the preferred supplier of turbines, and CSBC-DEME Wind Engineering (CDWE) is responsible for the transportation and installation of foundations.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Contracts & TendersWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

18 days ago

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

19 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

18 days ago
Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm
Ports & Logistics

Clarksons Wins Port & Agency Services Contract for OranjeWind Offshore Wind Farm

19 days ago