offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Contracts & Tenders›German Ministry Re-Ups FINO2 Tender
Contracts & Tenders

July 23, 2020 · about 6 years ago

German Ministry Re-Ups FINO2 Tender

Germany’s Federal Ministry for Economic Affairs and Energy (BMWi) has once again issued a tender for an operator of the FINO2 research platform. BMWi had issued a similar tender back in March which was cancelled in June after none of the offers received met the required conditions. The ministry now

1 minutes read
  • LinkedIn
  • X
  • Email
Germans Re-Up FINO2 Tender

Germany’s Federal Ministry for Economic Affairs and Energy (BMWi) has once again issued a tender for an operator of the FINO2 research platform.

BMWi had issued a similar tender back in March which was cancelled in June after none of the offers received met the required conditions.

The ministry now intends to commission the operation of FINO2 from 1 March 2021 to 28 February 2025, with an optional one-year extension. The tender will remain open until 23 September.

The operator will provide scheduled maintenance and repair, organize research operations in coordination with the measuring institutes, and organize and control all of the repair work, among other tasks.

The selected party will also be in charge of ensuring future research needs, ensuring the technical security of the platform and the safety of people and the environment, public relations, and coordination and cooperation with all relevant authorities.

The FINO2 platform is located in the German Exclusive Economic Zone (EEZ), about 33 kilometres north of the island of Rügen in the Baltic Sea.

As the second of a total of three research platforms of the BMWi, the FINO2 research platform was built in 2007.

The aims of these research platforms in the German North Sea and the Baltic Sea (FINO = Forschungsplattformen in Nord- und Ostsee) is to explore the environmental conditions at the site and to identify possible effects of offshore wind farms on the marine environment.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Contracts & TendersOperations & MaintenanceR&D

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

14 days ago

South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project
Contracts & Tenders

South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project

19 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK
Operations & Maintenance

Ørsted and Windcat Extend Crew Transfer Vessel Pact in UK

14 days ago
South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project
Contracts & Tenders

South Korean Supply Chain Players Tapped For 3.2 GW Offshore Wind Project

19 days ago