offshoreWIND.biz
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • News
  • About
  • Contact
JobsNewsletter
offshoreWIND.biz logo
Topics
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Power-to-X
  • Grid Connection
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Privacy
  • Report your news

© 2026 Navingo. All rights reserved.

Home›Grid Connection›Iv-Offshore Joins Sofia HVDC Platform Team
Grid Connection

July 27, 2020 · about 6 years ago

Iv-Offshore Joins Sofia HVDC Platform Team

Iv-Offshore & Energy has signed the early works contract with Sembcorp Marine for the engineering of the Sofia high voltage direct current (HVDC) platform. As previously reported, GE Renewable Energy’s Grid Solutions and Sembcorp Marine will provide the electrical transmission system for RWE’s 1.4 G

1 minutes read
  • LinkedIn
  • X
  • Email
IV-Offshore Joins Sofia HVDC Platform Team

Iv-Offshore & Energy has signed the early works contract with Sembcorp Marine for the engineering of the Sofia high voltage direct current (HVDC) platform.

As previously reported, GE Renewable Energy’s Grid Solutions and Sembcorp Marine will provide the electrical transmission system for RWE’s 1.4 GW Sofia wind farm offshore the UK.

Iv-Offshore & Energy is Sembcorp Marine’s engineering subcontractor for the balance of plant installation on this project and will provide detailed design for both the 10,000t topside and the jacket foundation, and the procurement of the topside equipment.

The Sofia offshore wind farm will comprise 100 Siemens Gamesa wind turbines installed 195 kilometres off the coast of the North East of England and on the shallow central area of the North Sea known as Dogger Bank.

The offshore converter platform will convert the electricity generated by the turbines from 66 kilovolts (kV) alternating current (AC) up to 320 kV direct current (DC) before transmission to shore.

In 2018, UK Grid Solutions Ltd (GE) and Iv-Offshore & Energy (Iv-ONE) completed a FEED study for the proposed Sofia HVDC platform.

Construction of the wind farm is due to begin onshore at its Teesside converter station site early next year, with offshore construction expected to get underway in 2023.

Reach the offshoreWIND.biz industry in one go!

offshoreWIND.biz is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow offshoreWIND.biz on:

Filed under

Grid ConnectionWind Farm Update

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Cadeler Adds Wind Ace to Fleet, First Stop East Anglia Two
  2. 2Turbine Installation at Thor Offshore Wind Farm Reaches Halfway Point
  3. 3South Korean Cable Maker Takes Delivery of Its Second Cable Laying Vessel
  4. 4Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

Related articles

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

12 days ago

Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

13 days ago

Daily offshore wind news in your mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team
Floating Wind

Aker Solutions Joins Bellrock Floating Offshore Wind Farm Team

12 days ago
Principle Power Wins O&M Contract for EFGL Floating Foundations
Operations & Maintenance

Principle Power Wins O&M Contract for EFGL Floating Foundations

13 days ago